Availability Availability

Availability

Currently Available Riverlabs 1

Currently Available
Riverlabs 1
From 2,082 sq ft (193 sq m) to 90,255 sq ft (8,385 sq m) of high specification CL2/3 lab space

Riverlabs 1 is 2,082 sq ft (193 sq m) to 90,255 sq ft (8,385 sq m) of state-of-the-art CL2/3 Lab, Office and manufacturing space.  It was built in 2013 by GSK to a very high specification and has been fully refurbished to bring it even further up to date and to create a building that can be divided up to fit any type of requirement.

Interstitial Second
Second selected
First
First unselected
Interstitial

Ground
Ground unselected
34,688 sq ft (3,223 sq m) 12,488 sq ft (1,160 sq m) 3,915 sq ft (364 sq m) 2,759 sq ft (256 sq m)

You can select any combination of these areas to suit your requirements:

Specification:

Ready for CL2 labs, CRO operations, biotech R&D, in-vivo research, regulated lab environments, and specialised translational studies.

Suite 2d in floor plan above is a fully-fitted, turn-key CL2 lab space.

  • Air handling units can be configured to support from ~14.9 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 2.6m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for CL2 labs, CRO operations, biotech R&D, in-vivo research, regulated lab environments, and specialised translational studies.

Suite 2d in floor plan above is a fully-fitted, turn-key CL2 lab space.

  • Air handling units can be configured to support from ~14.9 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 2.6m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for CL2 labs, CRO operations, biotech R&D, in-vivo research, regulated lab environments, and specialised translational studies.

Suite 2d in floor plan above is a fully-fitted, turn-key CL2 lab space.

  • Air handling units can be configured to support from ~14.9 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 2.6m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for CL2 labs, CRO operations, biotech R&D, in-vivo research, regulated lab environments, and specialised translational studies.

Suite 2d in floor plan above is a fully-fitted, turn-key CL2 lab space.

  • Air handling units can be configured to support from ~14.9 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 2.6m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
32,732 sq ft  (3,041 sq m) 9,970 sq ft (926 sq m) 8,259 sq ft (767 sq m) 8,061 sq ft (749 sq m) 2,082 sq ft (193 sq m )

You can select any combination of these areas to suit your requirements:

Specification:

Ready for CL2 labs, biotech R&D, CRO operations, diagnostics, computational biology, translational research, and advanced life sciences.

  • Air handling units can be configured to support from ~11.1 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for CL2 labs, biotech R&D, CRO operations, diagnostics, computational biology, translational research, and advanced life sciences.

  • Air handling units can be configured to support from ~11.1 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for CL2 labs, biotech R&D, CRO operations, diagnostics, computational biology, translational research, and advanced life sciences.

  • Air handling units can be configured to support from ~11.1 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for CL2 labs, biotech R&D, CRO operations, diagnostics, computational biology, translational research, and advanced life sciences.

  • Air handling units can be configured to support from ~11.1 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for CL2 labs, biotech R&D, CRO operations, diagnostics, computational biology, translational research, and advanced life sciences.

  • Air handling units can be configured to support from ~11.1 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
29,322 sq ft (2,724 sq m) 26,915 sq ft (2,500 sq m) 10,132 sq ft (941 sq m) 8,026 sq ft (746 sq m) 6,449 sq ft (599 sq m) 2,407 sq ft  (224 sq m)

You can select any combination of these areas to suit your requirements:

Specification:

Ready for multiple deep tech applications including biomanufacturing, chemical production, bioprocessing, advanced materials and diagnostics.

  • Air handling units can be configured to support from ~14.9 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for multiple deep tech applications including biomanufacturing, chemical production, bioprocessing, advanced materials and diagnostics.

  • Air handling units can be configured to support from ~14.9 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for multiple deep tech applications including biomanufacturing, chemical production, bioprocessing, advanced materials and diagnostics.

  • Air handling units can be configured to support from ~14.9 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for multiple deep tech applications including biomanufacturing, chemical production, bioprocessing, advanced materials and diagnostics.

  • Air handling units can be configured to support from ~14.9 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for multiple deep tech applications including biomanufacturing, chemical production, bioprocessing, advanced materials and diagnostics.

  • Air handling units can be configured to support from ~14.9 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces
Specification:

Ready for multiple deep tech applications including biomanufacturing, chemical production, bioprocessing, advanced materials and diagnostics.

  • Air handling units can be configured to support from ~14.9 up to 28 air changes per hour
  • Bottled laboratory gases
  • Strategically positioned drainage points
  • Secure loading and storage yard
  • Floor to ceiling working height of 3.5m (slab-to-slab 5.85m)
  • Capacity for backup power provision by way of external generators
  • Load bearing concrete floors
  • 4MVA to Riverlabs from UKPN
  • Vinyl over screed floor coverings to laboratory areas
  • High ducted fume cupboard capacity
  • Primary heating and cooling via highly efficient, electrically driven air/water source heat pumps at roof level
  • 602 car parking spaces

Room to grow...

A 28 acre purpose-built science and innovation campus in the heart of the Golden Triangle.

A scalable campus

Beyond Riverlabs 1, with up to 460,000 sq ft (42,735 sq m) of additional lab, office, and manufacturing space is available for bespoke refurbishment, plus potential ground up development options, ensuring your facilities can evolve alongside your ambition.

New GMP or R&D Facility

New ground up development – c110,000 sq ft (10,219 sq m) GIA floorplate R&D or GMP facility (STP)

New CL2 Labs

Potential new purpose-built bespoke R&D CL2 lab buildings – c30,000 sq ft (2,787 sq m) and c14,000 sq ft (1,301 sq m) GIA floorplates (STP)

Refurb Labs

140,000 sq ft (13,006 sq m) GIA extensive refurbishment of existing lab building

Refurb Labs

74,500 sq ft (6,921 sq m) GIA extensive refurbishment of existing lab building